Prepositions of Time: Deadlines, Duration and Timing
At B2, the challenge is not naming time. It is showing whether an action continues, finishes before a deadline, fills a period or prevents a problem.
What you will be able to do
Start with the meaning
Is Friday the deadline, or does the action continue until Friday? Predict each answer, then open the explanation.
1. Please send the revised proposal by Friday. Can it arrive on Thursday?
Yes. By Friday means no later than Friday. Thursday is before the deadline.
2. We kept the offer open until Friday. Was it open throughout Thursday?
Yes. Until Friday describes a situation continuing up to that end point.
The essential distinctions
By marks a deadline
Use by for the latest acceptable time. The action can happen earlier. Use until when an action or state continues up to an end point.
Finish it by six. · I will be working until six.
For measures, during locates
Use for with a length of time. Use during with an event or named period. Use while before a clause.
We spoke for an hour · during the meeting · while we were waiting.
In and within set different limits
In two hours can mean after two hours or the time needed. Within two hours means before two hours have passed.
I will call you in two hours. · Reply within two hours.
See the contrast
| Choice | Meaning test | Example |
|---|---|---|
| by | no later than | Submit the form by 5 p.m. |
| until | continues up to | The office stays open until 5 p.m. |
| for | how long? | She worked there for six months. |
| during | inside which event or period? | No phones during the interview. |
| on time | at the scheduled time | The train left on time. |
| in time | early enough to prevent a problem | We arrived in time to board. |
A three-step decision tool
Three traps to avoid
Staying is a continuing situation, so use until.
Three hours is a duration, not the name of an event.
Use on time for a published or agreed schedule.
Guided practice
Say your answer aloud before opening the explanation.
1. The application must reach us ___ 30 September.
by, because 30 September is the final acceptable date.
2. The roads were quiet ___ the public holiday.
during, because the public holiday is a named period.
3. We waited ___ the rain had stopped.
until, because the waiting continued to that end point.
4. Please report any damage ___ 24 hours.
within, because the report must happen before the 24-hour limit expires.
Mastery test
Target: 6/8